Time and Cost Estimation for Ali Nayfeh School

dc.contributor.authorMohammed Basem Mahamdeh
dc.contributor.authorAdnan Karem Amira
dc.contributor.authorHusam Jehad Yousef
dc.contributor.authorMurad Azzam Odeh
dc.contributor.authorMoaz Raed Nuirat
dc.date.accessioned2022-06-07T08:57:10Z
dc.date.available2022-06-07T08:57:10Z
dc.date.issued2021
dc.description.abstractThe construction sector is one of the most important sectors in the Palestinian economy, because of its economic role in generating income, employment, providing buildings for housing and economic activities, and in view of the significant contribution of the construction sector to the Palestinian GDP and the increase in the complexity of construction projects, the management of these projects has become important. The importance of this project is of the importance of management in general, and especially of management in construction projects. Which is often overlooked as neglecting it leads to the occurrence of many problems, including exceeding the specified time and cost in addition to an incomprehensible overlap in the project activities. In this project, the Ali Nayfeh School building in Tulkarm will be studied, and this school consists of four floors, with a total area of 3571 square meters. The construction documents of this school will be studied and the project's time and cost, will be calculated, and in the end we will compare the time and the estimated cost and the actual time and cost. This study aims to clarify the importance of applying management principles and new engineering programs for contractors and engineering offices in the Palestinian construction sector, and this will be clarified through the use of the PRAMIVERA program to make scheduling and time management for the project, and the REVIT program to calculate quantities for all school items, in addition to providing a three-dimensional presentation through the lumen program The proposed methodology for this project would be: 1) Studying the construction documents for the project 2) Estimating the project schedule using Primavera 3) Conducting a regular quantitative survey of the project using Revit 4) Estimating the detailed cost of the project 5) Providing the triple view of the project This study is expected to provide timetables, required total cost, and provide a proposal to solve any problems about the time and cost that may occur in any construction projecten_US
dc.identifier.urihttps://hdl.handle.net/20.500.11888/16965
dc.supervisorReema Nassaren_US
dc.titleTime and Cost Estimation for Ali Nayfeh Schoolen_US
dc.typeGraduation projecten_US
Files
Original bundle
Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
ar-abstract.docx
Size:
16.93 KB
Format:
Microsoft Word XML
Description:
Loading...
Thumbnail Image
Name:
ppt.pptx
Size:
94.43 MB
Format:
Microsoft Powerpoint XML
Description:
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: