Updating of the Existing Regional Master Plan for Water Supply in Tubas

No Thumbnail Available
Date
2022
Authors
Anas Ahmad Haj Mahmoud
Hamdan Essa Dababat
Sohib Rushdi Jayyuosi
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
The aim of the project is to analyze the water network of Tubas joint water service and sanitation council and redesign the network to meet the requirements for the next 20 years (2022-2042), where it service Tubas, Aqaba, Tayasir, Tammun, Al'Aqaba,Khirbet 'Atuf and Ras al Far'a Which has a population of 46889 according to Palestinian Statistics Center (2017) . The methodology that will be adapted in our project can be summarized in the following: 1-Collect information and reliable data. 2-Assessing the future demand for water, as the increase in the population will increase the demand, and studying the water gap that the Tubas Water Council will suffer from. 3-Based on available supply, the project will estimate future water gap for the different planning years, 2027, 2032 and 2042. 4-Devlop the existing water sources to bridge the future water gap. 5-Develop a master plan for the next 20 years with a description of the different proposed interventions. In addition, the project will prioritize the different interventions and develop a cost estimate for the different plan components. The expected outcome from this project is a master plan for the next 20 years with description of the different proposed interventions.
Description
Keywords
Citation