Integrated redesign of the Ministry of Education

No Thumbnail Available
Date
2024
Authors
ياسمين رواجبه
سجود تيسير
نور دراغمه
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Integrated building design has become one of the most important requirements in the current World.In order to ensure that buildings are created to the greatest standards and that users are comfortable, Any structure, area, or part of a structure that is primarily or exclusively utilized for office, administrative, or other forms of work is referred to as an office building. Based on the principles of integrated design of the Ministry of Education building, which was designed, constructed and the building is in operation purpose of the project to reevaluate the current building design and performance, which is It is located in Al-Ma'ajin in Nablus Governorate on a plot of land with a total area of 1790 square meters, which is divided into 5 floors, In addition to a three-story basement with an area of 1361.66 square meters. As the first stage of our project, data was gathered, and this data was then used to assess the goals of the architectural design. We evaluated the building's vital amenities, such as emergency staircases, before making any changes. To make sure they adhere to standards, check elevators, parking lots, and escape routes. The building has been assessed from an environmental point of view depending on the Revit program and the Design Builder program. The cooling load (271Kw) and the heating load (171 Kw) were calculated, and comparing the results with those after the adjustments. The energy consumption of the building has been estimated (70 Kw/m2). And then the best structural system that supports the building and meets the necessary economic criteria is selected. Next, computer programs are used to create a safe design. In this project Investigation has been carried out by using computer programs like AutoCAD, Revit, Etabs, Design Builder, and Lumion . Part two of the study included the following research: further information about the passive system's environmental design that is suggested to enhance system performance, For the design, more thorough structural analysis was done in accordance with certain guidelines. By integrating these intricate structural factors into the design process, the project sought to produce a safe, affordable, and environmentally friendly solution that complies with the required design criteria. The project included electromechanical issues in addition to architectural and structural ones. In order to secure these aspects, different engineering systems had to be designed and integrated. ideal functionality and performance Through the consideration of these electromechanical elements, the project sought to guarantee the smooth amalgamation of diverse technical systems, culminating in a completely operational and eco-friendly structure that fulfills the intended performance standards. A thorough cost estimate and quantity surveying procedure were carried out as part of the project. This required a thorough examination of the supplies, manpower, and other materials needed for the building project, as well as an estimate of the related expenses Throughout the project lifespan, efficient budgeting, cost control, and well-informed decision-making were made possible by the cost estimate and quantity surveying processes, which offered insightful information about the expected project costs. Our project's ultimate output will be a comprehensive redesign of all engineering systems in compliance with these kinds of building guidelines. Our project's ultimate output will be a comprehensive redesign of all engineering systems in compliance with these kinds of building guidelines. Key word: environmental, office building, energy efficiency, energy consumption, Integrated building design.
Description
Keywords
Citation