Cost and Time Management of the Nablus City Mall

dc.contributor.advisorReema Nassar
dc.contributor.authorGhalib Al-Sheikh
dc.contributor.authorMahmoud Awad
dc.contributor.authorOsama Kolayb
dc.contributor.authorSa’ed Turkman
dc.date.accessioned2018-01-22T07:24:57Z
dc.date.available2018-01-22T07:24:57Z
dc.date.issued2018
dc.description.abstractThe project includes quantities survey, cost and time management for (Nablus City mall) located in Nablus Sufiyan street near city this part of the project complete part one which is consists analysis and design for gravity loads. This structure is under construction and it consists of a total of fourteen floors (four basements, ground floor and nine floors with total area of 35555.5 m2. The fourth basement and the floors from seventh to ninth are garages and the remaining floors are offices and shops. The structure is divided into three blocks by seismic joints. Revit computer software will be used in calculating quantities and primavera professional in scheduling time and cost estimate. At the end of the project we expected to: 1- Give a detailed information about quantities take off for all calculated works in this project. 2- Determine the optimal duration for the project after connect all activities to each other. 3- Estimate the total budgeted cost and price in planning phase.en_US
dc.identifier.urihttps://hdl.handle.net/20.500.11888/12929
dc.language.isoen_USen_US
dc.titleCost and Time Management of the Nablus City Mallen_US
dc.typeGraduation Projecten_US
Files
Original bundle
Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
ar-abstract.docx
Size:
17.15 KB
Format:
Microsoft Word XML
Description:
Loading...
Thumbnail Image
Name:
ppt.pptx
Size:
8.25 MB
Format:
Microsoft Powerpoint XML
Description:
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: