Redesign of Gaza International Airport – Airside

dc.contributor.authorOsama Nedal Demaidi
dc.contributor.authorWaleed Bassam Shawahne
dc.contributor.authorLeena Abdulrahmman Jarrar
dc.contributor.authorTasneem Azmi Ali
dc.date.accessioned2022-08-31T09:40:43Z
dc.date.available2022-08-31T09:40:43Z
dc.date.issued2022
dc.description.abstractThe means of aviation has become a necessity for any country in the world, as it is the gateway that overlooks the rest of the world. Palestine is one of the few countries that does not have the right to fly due to the presence of the Zionist occupation on its land. This matter prompted and provided us with the determination to establish an international airport in our country. This project aims to rehabilitate and expand Gaza International Airport in order to enhance transportation in Palestine. Air is one of the fastest means of transportation. Airports have become also as platforms that generate revenues from aviation, air and commercial activities. Gaza International Airport, located in the southeastern part of Gaza Strip, was operated in 1997. The airport gave the citizens of Gaza Strip better access to the world outside their narrow confines, but the long-awaited airport didn't last long though. It was destroyed by the Israeli occupation authorities in 2001. In view of the restrictions imposed by the occupation on the Palestinians on travel and movement and their impact on the Palestinian economy, the rehabilitation of the airport will make a difference in the lives of the Palestinians. Initially, the airport was assessed in terms of its compliance with the safety standards and requirements of the Federal Aviation Administration (FAA) and all data necessary to forecast the demand for the airport was collected. The airside facilities of Gaza International Airport include runways, taxiways system, apron area, and the terminal building are planned and designed using (FAA) regulations. Gaza airport is developed in three phases through 2027-2034, 2034-2042 and 2042-2050. At the end of the last phase the airport is proposed to have 5.7 million passengers and a single runways with a length of 3.6 Kmen_US
dc.identifier.urihttps://hdl.handle.net/20.500.11888/17078
dc.supervisorSameer Abu-Eishehen_US
dc.titleRedesign of Gaza International Airport – Airsideen_US
dc.typeGraduation projecten_US
Files
Original bundle
Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
ar-abstract.docx
Size:
13.97 KB
Format:
Microsoft Word XML
Description:
Loading...
Thumbnail Image
Name:
ppt.pptx
Size:
13.16 MB
Format:
Microsoft Powerpoint XML
Description:
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: