Design and Analysis of an Electric Network for the cities of Palestine " Nablus, Jenin and Tubas"

dc.contributor.authorTayeb Jarrar
dc.contributor.authorDeena Tartir
dc.contributor.authorMira Omar
dc.contributor.authorShaimaa Rawajbeh
dc.date.accessioned2024-09-08T09:38:55Z
dc.date.available2024-09-08T09:38:55Z
dc.date.issued2024
dc.description.abstractAfter collectingdata for the cities of Nablus, Jenin, and Tubas and the connection points that supply them, several configurations were created for a unified network that supplies these cities with electrical energy. Four realistic configurations were adopted to design the network so that a comparison could be made between them to obtain the best configuration from a technical standpoint. [1] It is necessary to conduct an economic analysis and study that includes transformers, switches, transmission lines, and the loss in real capacity for each configuration, and obtain the annual cost of each of them in order to make an economic comparison between them and choose the configuration that is best from a technical standpoint and the least expensive from an economic standpoint among them. After obtaining the best configuration among them (the fourth configuration), a simulation of this configuration was created and exposed to the most common conditions that the electrical network could be exposed to, such as the state of maximum and minimum loads, the post-fault state, future loads, adding the solar system to the network, and taking the steps. The appropriate improvement for each case, and a summary of that explains the methods of improvement in each case, and also a summary of the important parameters in each case, such as the voltage ratios, the percentage of real power losses, the value of the power factor, and the value of the apparent power given by the swing stabilization point (the swing generator), This is to facilitate comparison between each case and another
dc.identifier.urihttps://hdl.handle.net/20.500.11888/19517
dc.supervisorDr. Maher Khammash
dc.titleDesign and Analysis of an Electric Network for the cities of Palestine " Nablus, Jenin and Tubas"
Files
Original bundle
Now showing 1 - 4 of 4
Loading...
Thumbnail Image
Name:
Abstract.url
Size:
364 B
Format:
Unknown data format
Description:
Loading...
Thumbnail Image
Name:
report.url
Size:
373 B
Format:
Unknown data format
Description:
Loading...
Thumbnail Image
Name:
الخلاصة.url
Size:
365 B
Format:
Unknown data format
Description:
Loading...
Thumbnail Image
Name:
المناقشة.url
Size:
329 B
Format:
Unknown data format
Description:
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: