Design of A Sewer Network For Tell Village

dc.contributor.advisorAbdel Fattah R. Hasan (Almallah)(Department Head)
dc.contributor.authorIbraheem Imad Ramadan
dc.contributor.authorMajd Omar
dc.contributor.authorMohammed Abdul-Salam Husein
dc.date.accessioned2017-11-21T12:28:25Z
dc.date.available2017-11-21T12:28:25Z
dc.date.issued2015
dc.description.abstractTell village is the main focus of this project. Tell Village has no sewer network, so this project is a bare necessity.   There are many aspects that were considered in this project. First of all, the number of population in future depending on increasing rate, the economic evaluation of the project, also the adequacy of the Sewer network will be checked to meet the peak flow condition. Another important aspect is to make sure that velocities and slope values are within the acceptable and designed range.   Its cleared that the main objectives of this project is to hydraulically design a wastewater collection system for Tell Village Area by using SewarCAD program, in addition to estimate the potential cost of this network. This project time period will be twenty years, with minimum cost and with high efficiency.    Methodology starts by collecting data and information from the area of study and from previous studies related to this project, including the demand which is computed from the number of people. And by using the suitable computer programs (SewerCad and GIS). These data were used to design networks which meet the required objectives.  en
dc.description.abstract. .   . . .   SewarCAD  . .   . (SewerCad GIS). .  ar
dc.identifier.urihttps://hdl.handle.net/20.500.11888/11375
dc.titleDesign of A Sewer Network For Tell Villageen
dc.titleDesign of A Sewer Network For Tell Villagear
dc.typeGraduation Project