Optimum Performance of Tulkarim Governorate Network & Sarra Connection Point
dc.contributor.advisor | Imad Ibrik | |
dc.contributor.author | Woroud Turabi | |
dc.contributor.author | Ahmad Nasralla | |
dc.date.accessioned | 2017-11-21T12:29:24Z | |
dc.date.available | 2017-11-21T12:29:24Z | |
dc.date.issued | 2014 | |
dc.description.abstract | Abstract The important aspects to be covered in this project are preparing the initial data for Tulkarim Governorate network & Sarra Connection Point and subject to a load flow study using modern software like ETAP to improve the voltage level and the power factor and reduce the electrical losses by Reconnection the two networks with Sarra electricity converter station which converts from 33Kv to 11Kv instead of (33\6.6) KV. | en |
dc.identifier.uri | https://hdl.handle.net/20.500.11888/11832 | |
dc.title | Optimum Performance of Tulkarim Governorate Network & Sarra Connection Point | en |
dc.type | Graduation Project |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- mshrw-ltkhrj-lnhyy.pptx
- Size:
- 1.1 MB
- Format:
- Microsoft Powerpoint XML
- Description: