MECHANICAL SYSTEMS IN BUILDINGS selfeEt mall

No Thumbnail Available
Date
2013
Authors
ORAIB AWAD
Belal Quzaq
Abed al rahman salalmah
moumen hattab
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
The project consists of five chapters distributing between introduction in heating and air conditioning background, literature review, mall description, fire fighting , plumbing system. and under floor heating and cooling system The project consists of five chapters distributing between introduction in heating and air conditioning background, literature review, mall description, fire fighting , plumbing system. and under floor heating and cooling system Chapter one describe the details of the mall, which explain the parameters that used through the design calculation, Also introduction for why wil we do in building(a brief introduction of the project).Chapter two is a literature review of an air conditioning systems, comfortable human body, ventilation and infiltration, chiller types, fan coil units ( FCU), air handling units    ( AHU) and there types and components.Chapter Three the heating and cooling calculation.Chapter five describe the details of the under floor heating and cooling system, which explain the parameters that used through the design calculation. Chapter six deals with plumping and fire alarm safety and services including fighting system, fire alarm system, medical gas system , potable water and drainage.
Description
Keywords
Citation