Nablus Municipality

dc.contributor.advisorMuayed A. Salhab
dc.contributor.authorWasan Sami Najjar
dc.contributor.authorMajd
dc.contributor.authorFathiye
dc.date.accessioned2017-11-21T12:31:00Z
dc.date.available2017-11-21T12:31:00Z
dc.date.issued2015
dc.description.abstractThe idea of this project came from the insistent necessity for a new municipality building in the Nablus  instead of old building . its response about the service of the citizens, organize markets, develop the city, lighting streets and keep the clean of the city. Most important goal of the project is to create a link of communication between service centers through collected in one situation so as to make it easier for citizens to spend their needs without having to travel long distances.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   The design stage extended to architectural, structural, electrical, mechanical & environmental design to suit the customers requirements and staff , Through the creation of suitable spaces and minimize the obstacles and facilitate the movement of customers between service centers. The architectural design will focus on selecting the shape, the orientation and the form of the structures depending on the functionality and the environmental requirements by using computer programs like AutoCAD, Revit, Deluxe, and Design Builder. In the structural design, the structures in the project will be analyzed and designed using computer software such as SAP & Revit. The analysis will include 3-D model of the structure, and soil structure interaction. In mechanical design, HVAC, water supply, and sanitary systems in the project will be analyzed and designed. The electrical design will include designing power and lightening systems in the project. Public safety , designing the emergency exits, alarm system and fire protection system . This is not a new project in the city , there have similar applicationen
dc.description.abstract, , (2014-2015)  , (2014-2015)   . . . , . . . 90 .     . .     . .       .   . , .  ar
dc.identifier.urihttps://hdl.handle.net/20.500.11888/12521
dc.titleNablus Municipalityen
dc.titleNablus Municipalityar
dc.typeGraduation Project
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
nablus_municipality.pptx
Size:
13.27 MB
Format:
Microsoft Powerpoint XML
Description: