Lean six sigma on Mega Bricks Factory

dc.contributor.advisorMohammed Othman (Department Head)
dc.contributor.authorReem Awad
dc.contributor.authorMostafa Ghanim
dc.contributor.authorYasmn Nser
dc.contributor.authorMoath Barameh
dc.contributor.authorMamon Skafi
dc.date.accessioned2017-11-21T12:29:36Z
dc.date.available2017-11-21T12:29:36Z
dc.date.issued2016
dc.description.abstract Mega Brick's factory established at 2010 with stuff of 12 worker  and one production line  and five kind of Bricks produced  , the company has a problems that affect  the work and effect quality and make the ordered higher than  the manufactured , that cost the company a large amount of money and limited its  sales .This project aims at solving the existing problems in the manufacturing procedure by Applying lean six sigma to eliminate any type of waste and improve the quality level and increase the revenue. To solve the problems that have been put forward previously, the team  will redesign  the manufacturing  procedure and responsibility and duties in this  factory  by using lean six sigma tool and based on the (DMAIC )  procedure Define  ,Measure  ,analysis , improve ,control.  en
dc.description.abstract  ,   (lean six sigma  )   .   50%  ar
dc.identifier.urihttps://hdl.handle.net/20.500.11888/11870
dc.titleLean six sigma on Mega Bricks Factoryen
dc.titleLean six sigma on Mega Bricks Factoryar
dc.typeGraduation Project
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
brzntyshn-2.pptx
Size:
4.12 MB
Format:
Microsoft Powerpoint XML
Description: