Resource Significant Cost and Time Models for Building Projects

Loading...
Thumbnail Image
Date
2003
Authors
Nabil Dmaidi
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Cost and time models have been developed for road and bridge projects using resource significance analysis, which is in turn based on the 80/20 rule. The work packages in these models are designed to relate to site operations. They serve as the basis for measurement, estimating, planning, valuation and control in civil engineering projects. For defined categories of work, a standard set of work packages have been developed which consistently contribute about 90% of a project's resource costs and hours. The resource significant cost and time models for bridges and roads predict cost to an accuracy of 4% Cv and 3% Cv respectively. The resource hours for a project can be predicted to an accuracy of 6% Cv for bridges and 3% Cv for roads. The bridge model contains 26 work packages and the road model contains 22 work packages. Coarser models have also been developed for situations where the road or bridge is only part of an overall project, with only a small loss of accuracy.
لقد تم اشتقاق نماذج لحساب الكلفة والفترة الزمنية لمشاريع الطرق والجسور باستخدام نظرية العناصر الاكثر أهمية والتي تعتمد على قانون 80/ 20%. إن الرزم في هذه النماذج تصف العمليات الإنشائية وقد استحدثت كأساس للقياس، وللحسابات، وللتخطيط ولمراقبة المشاريع الهندسية، لقدتم اشتقاق نماذج أساسية لهذه الرزم والتي تمثل 90% من عناصر الكلفة والوقت. إن نماذج حساب الكلفة والفترة الزمنية للجسور والطرق بإمكانها حساب الكلفة والفترة الزمنية بمقدار خطأ 4% للجسور،3% للطرق. إن الفترة الزمنية للمشروع يمكن حسابها بمقدار خطأ 6% للجسور و3% للطرق. أن نموذج الجسور يحتوي على 26 رزمة ونموذج الطرق يحتوي على 22 رزمة، كذلك تم اشتقاق نموذج عندما تكون الجسور والطرق جزء من المشروع العام مع فقدان الدقة بنسبة ضئيلة.
Description
Keywords
Citation