Wastewater collection system of Ajja village

dc.contributor.authorAmeed Salem
dc.contributor.authorAlaa Maaly
dc.contributor.authorIbrahim Alawneh
dc.date.accessioned2017-11-21T12:28:23Z
dc.date.available2017-11-21T12:28:23Z
dc.date.issued2015
dc.description.abstractDue to the lack of sanitation network for the village, this is causing many environmental problems and other problems faced by the soil and sometimes  human. Therefore, we have designed a sewerage system for the disposal of wastewater and thus get rid of the problems affecting. Through the design process, we do a number of steps until we get the final design, Where we started analyzing the network through the maps available to us and that by drawing a subnetwok lines to reach the main line through the AutoCAD program and then convert it into the main program in the design process Sewer CAD then we have to add input data  to the program to get ready for the Ranning and get the results which we will compare it with the standards available such as velocity, slope, and cover. en
dc.description.abstract, .   SewerCAD .ar
dc.identifier.urihttps://hdl.handle.net/20.500.11888/11355
dc.titleWastewater collection system of Ajja villageen
dc.titleWastewater collection system of Ajja villagear
dc.typeGraduation Project
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
presentation_4.pdf
Size:
5.75 MB
Format:
Adobe Portable Document Format
Description: