Rehabilitation of qalqiliaya Electrical Network by adding a new connection point

No Thumbnail Available
Date
2017
Authors
Eid, Ammar
farraj, Mahmoud
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
The project aims to study the performance of Qalqiliya Electrical network and to add a new connection point in the south region of the city of Qalqiliya with a maximum capacity of 7MW from the electrical Israel Company. A load flow study and analysis for Qalqiliya Electrical network using ETAP software will be performed ,this will include original condition and determine the existing voltage , power loss and power factor , to see the effect of adding a new connection point to the network, improve the power factor , improve the voltage level and reduce the electrical losses in the network and suggest solution of adding capacitor banks and change tap changer and adding a new connection point and change the configuration (for example adding a Ring) and so reducing the penalties in the total tariff for the municipality and increasing the reliability of the network . To do that we will follow the sequence below: 1- Collect Data about Qalqiliya municipality. 2- Study the original condition. 3- Determine the exciting problems. 4- Compare the two conditions (with a new connection point and without connection point). 5- Economical study. 6- Give recommendations and conclusions.
Description
Keywords
Citation