Rehabilitation of qalqiliaya Electrical Network by adding a new connection point
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
The project aims to study the performance of Qalqiliya Electrical network and to add a new connection point in the south region of the city of Qalqiliya with a maximum capacity of 7MW from the electrical Israel Company.
A load flow study and analysis for Qalqiliya Electrical network using ETAP software will be performed ,this will include original condition and determine the existing voltage , power loss and power factor , to see the effect of adding a new connection point to the network, improve the power factor , improve the voltage level and reduce the electrical losses in the network and suggest solution of adding capacitor banks and change tap changer and adding a new connection point and change the configuration (for example adding a Ring) and so reducing the penalties in the total tariff for the municipality and increasing the reliability of the network .
To do that we will follow the sequence below:
1- Collect Data about Qalqiliya municipality.
2- Study the original condition.
3- Determine the exciting problems.
4- Compare the two conditions (with a new connection point and without connection point).
5- Economical study.
6- Give recommendations and conclusions.