Now showing items 1-20 of 248

    • Design of Passive Solar System for a Local Building 

      Montaser M. Shhadeh; Mohamad auwaysat; Amer Abu salah; Farajeyah Alamoudy (2007)
    • Passive Solar Design 

      Mohammad Omariah; Amani Al-majdoubeh; Maher Matar; Atheer Zedan (2009)
    • 

      ; ; ; ; ; (2009)
    • 

      ; ; ; (2009)
    • Design Of Hotel 

      Ayman Zeyad Fuqha; Waheed Ghaleb Abu-Eisheh; Abd-Elraheem Abu-Wahdan; Sami Mahmoud Abu-Elrab (2010)
      This project shows the structural analysis and design for the building of Hotel Five Star . The building consist of seven story with area   (505 m2 ). The project has been divided to (7 block ) by seismic ...
    • Under Floor Heating Using Solar Energy 

      Mustafa Saqer Saqer; Samer Wassif Qazza (2010)
      :   .  . . . .        . .  
    • Design Of School 

      ; ; (2010)
      9 40 12 11 ...
    • Design of a restaurant with the use of solar energy 

      .; ; (2010)
         ( )      1948 ( 48)    <!-- /* Font Definitions */ @font-face {font-family:"Cambria Math"; panose-1:2 4 5 3 5 4 6 3 2 4; ...
    • Introduction to projects and project 

      Emad Alia; Moa'en Zain (2010)
      <!-- /* Font Definitions */ @font-face {font-family:"Cambria Math"; panose-1:2 4 5 3 5 4 6 3 2 4; mso-font-charset:0; mso-generic-font-family:roman; mso-font-pitch:variable; mso-font-signature:-1610611985 1107304683 ...
    • Nablus Public Halls 

      ; ; (2010)
      <!-- /* Font Definitions */ @font-face {font-family:"Cambria Math"; panose-1:2 4 5 3 5 4 6 3 2 4; mso-font-charset:0; mso-generic-font-family:roman; mso-font-pitch:variable; mso-font-signature:-1610611985 1107304683 ...
    • Dynamometer Nablus 

      Adham Zuhair Dweikat; Raid sadaqah (2010)
      This project is a dynamometer building named: (dynamometer Nablus ) in Nablus. And its consist ofGround Floor: 584.5 mFirst Floor: 584 mtop Floor: 240mThe contract interval time is 350 calendar days and the contract use ...
    • Nablus City Hall 

      Areen Abu Zaid; Zinab Abu Shaqdam; Mdlaeen Godeh (2010)
      A building lies in the western side of Nablus , this building consist of two stories of (8000 m2) , and height of each storey is (5m). Ground floor consists of two main halls, library, cafeteria, bathrooms, security and ...
    • Rafedyaa tower 

      Yazan Aqel; Mohammed Khrasha; Mo'ez Sad Eldien (2010)
         90, 90 :   ( ): 3 3300 .   :  6   ...
    • Integration project of the Chamber of Commerce and Industry - Tulkarm 

      Ala alddin Qaisi; Khaled Farhaneh; Abd El-Rahman Alheen (2010)
        . , , .
    • Cultural Center( Tulkarem City) 

      Haneen Hamarshe; Dua'a Hammad; Heba Abu Hamed (2010)
        * 242 . *   200 .   50   . . , . . ...
    • () 

      ; ; ; (2010)
    • Hwara Hospital 

      Rana Ahmad Saeed; Maysaa Abd-Alrahem Shhadi; Mohaya Ahmed Abu AlWafa (2011)
       This project talks about redesigning of Hewara hospital  which needs a lot of care , the focus is taken in Hewara  itself because of the lack of hospitals in this region  ,and also hospital which based ...
    • The Effect of adding Rubberized material in concrete 

      Moayad Assayra; Mohammad Abu Haniya; Hani Mansor (2011)
         The objective of this study is to show the effect of adding  rubber to concrete to improve the  properties of concrete . and the effect of adding rubber as an admixture on the workability , strength ...
    • Towards Green Building ( Fine Arts Building ) 

      Ayah Hassan; Ghadeer Otear; Saja Sweidan (2011)
      Case study: Fine Arts Building( at An Najah national University)The Project  Idea Modify Certain aspects  to make the Building  more  environmentally friendly (green). 
    • / 

      ; ; (2011)
      . 19     :