Graduation Project Water Works for Al-Marj Neighborhood By :- Ateid A. Afaneh Qassam R. Mara’bi Issam K. Arabas An-Najah National University Faculty of Engineering Civil Engineering Department Supervisor : Dr. Abdel-Fattah Al-Mallah Outline Introduction Problem Description Study area Objective Methodology Design Results BOQ Introduction The issue of water is considered to be the basic element needed to assure the actual independence in socio-economical development. The main two recourses of water are surface water and ground water. As other cities in Palestine, Qalqilya depends on renewable ground water as a primary water supply for different needs. An applicable and practical WDN will be a primary requirement to meet this needs. Qalqilya According to PCBS, It has a population of 50,586 (2015) It is located above the western basin . Problem description The problem begins by Oslo Accord which leads to reduce the area of Palestine. This allowed to divide the land into A,B and C zones. Due to scarcity of municipal building areas, people changed their trend of expansion to agriculture lands which is in C zone. Al-Marj neighborhood in Qalqilya is an example of this situation. Israeli Restricts (2006) Study Area – Location-Area-population The area about 0.62 Km2 in C zone. It has population of 500 inhabitance is rapidly increasing. 50586 7.3 Km2 X 0.62 Km2 X = 4300 inhabitants P2045 = 500 (1+ 2.5%)30=1050 The final estimation = 4300+1050 = 5350 inhabitants Study Area – Water Resources It is fed with water from Al-Montazah Tank through a random and scattered steel water network. Objective Find a practical solution which includes a design of WDN for Al-Marj area considering water needs for the next 30 years. The work will use different softwares such as WaterCAD software. Methodology Design - Hazen William Shapefiles in WaterCAD Elevation And Demand Total demand = 175/1000 * 5350 = 936.25 m3/d Elevation of the reservoir = 123 + 20 = 143 m. Nodes & Thiessen Polygons Pipes In The WDN Running The Model Checking the PEAK case Assume peak daily factor = 2 Total demand = 950 *2 = 1900 m3/d Checking the PEAK case Pressure < 20 mH2O Pump Definition Pump Data Checking the PEAK case Constraints Velocity : acceptable limits ( 0.3 – 3 ) m/s Pressure : acceptable limits ( 20 – 80 ) mH2O Material : HDPE Pipes Diameters : ( 0.5, 0.75, 1, 1.25, 1.5, 2, 2.5, 3, 4, 6, 8 and 10 )inches Results – Steady-state Results – Steady-state Min pressure value is 28 mH2O Max pressure value is 65 mH2O Results – Steady-state Results – Steady-state Min velocity value is 0.22 m/s Max velocity value is 1.63 m/s Results – Steady-state The total length of the pipe equals 6827 m. The largest percent of pipe diameter is 3 inches Use HDPE pipes. Results – Peak Results – Peak Recommendations Periodic test for the water quality. Putting an operation and maintenance plan for this WDN by the municipality. This area suffers from sewage problems, so waste water network must be designed. Thank You image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.png image11.jpeg image12.jpeg image13.png image14.png image15.png image16.png image17.jpeg image18.jpeg image19.png image20.png image21.jpeg image22.jpeg image23.jpeg image24.jpeg image25.jpeg image26.jpeg image27.jpeg image28.png