An-Najah National University Faculty Of Engineering civil Department Construction project management Prepared by : Fares Obaid Mohamad Barqawi Hisham Melhim Supervisor : Eng. Rema Nassar An-najah national university construction project management date: 24-5-2012 Overview Construction project management : Part 1) includes preparing a theoretical research Part 2) includes the application of the principles in construction project management An-najah national university construction project management date: 24-5-2012 Case Study  Construction of Multipurpose sport Hall 1-Location: Sulfite City 2-Area: (2500) m2 3-1000 audience loading capacity 4-The Hall including four Olympic sport Courts Hand, Basket, Volley ball and Tennis. An-najah national university construction project management date: 24-5-2012 An-najah national university construction project management date: 24-5-2012 Case Study Shop drawing: Assumptions 1-Working days are all days except Friday 2-each working day is full eight hour 3-The electrical and mechanical works will be done by sub contractors. 4-Fixing the value of dollar with (1dollar =3.7 NIS). 5-Labor unit cost: Foreman: 60 $/day Helper: 20 $/day An-najah national university construction project management date: 24-5-2012 Work Breakdown Structure An-najah national university construction project management date: 24-5-2012 Bill of Quantity Preparation Calculations were made depending on Drawings to find The Quantities and tabulating it. An-najah national university construction project management date: 24-5-2012 pricing 1-The costing process based upon past experience for the contractor. 2-The pricing for each element of unit was different from each other, some units were priced according to the area, others were priced according to the number of units. An-najah national university construction project management date: 24-5-2012 Cost estimation These values obtained from filling WBS with each cost of each activity . Labor cost= 72460 $ Equipment cost= 91590 $ Material cost= 737873 $ Total direct cost= labor cost + equipment cost + material cost= 901923.6 $ An-najah national university construction project management date: 24-5-2012 Cost estimation Total indirect cost =99211 $ Total price = direct cost + indirect cost + profit = 1564850 $ Cost estimation These calculation obtained from primavera: Cost estimation Labor cost: An-najah national university construction project management date: 24-5-2012 Cost estimation Material cost: An-najah national university construction project management date: 24-5-2012 Cost estimation Equipment cost: An-najah national university construction project management date: 24-5-2012 Cost estimation Total direct cost= 901987$ An-najah national university construction project management date: 24-5-2012 direct cost from primavera =901987$ direct cost by using excel = 901923$ difference = 63$. Why ? Cost estimation An-najah national university construction project management date: 24-5-2012 Cost calculation From contractor: price = 1771388 $ Our calculation: price=1564850.86 $ why ? Results summary Problems The project faces some problems in funding, it was funded by the ministry of finance and some payments delayed which leaded to delay of the project. This delay causes increasing in the cost of the project. So, we applied management techniques and programs like primavera to control the time and cost. Time calculation 1-The planned duration of the project is 360 calendar day 2-we obtained that from primavera we need 240 calendar day to complete the project. An-najah national university construction project management date: 24-5-2012 Recommendation Most of the project in Palestine funded by donor countries ,so these projects faces problems in funding which leads to delay in these projects because of that ,the using of management program is difficult due to the difference between what we planned and what we done in the field image2.jpeg image3.png image4.png image5.jpeg image6.jpeg image7.png image8.png image9.png image10.png image11.png /docProps/thumbnail.jpeg