Assessment of Sports Hall & Students Affairs in the Arab American University Prepared By: Aya Nayef Sulaiman Batool Jameel Mubaslat May Ahmad Sawaftah Supervied by : Eng. Reema Nassar Contents:  Chapter One :. Project Definition.  Chapter Two : General introduction.  Chapter Three : Methodology. Quantity Surveying  Cost Estimate  Time Schedule  chapter Four : Results and Analysis. Chapter one: Project Definition Sport hall Area Floor Item# 2475 m2 Ground Floor 1 1123 m2 First floor 2 4931 m2 Second floor 3 Area for each floor Function of sport hall Play courts Meeting room Apparatus room Caretakers Cleaning room Storage Service room Changing Room Service corridor Mal WC Event Stage Female w.c Aerobics Instructor Sound system Mechanical room Press TV/Radio VIP stages   Students affairs Area Floor Item# 1230 m2 Ground Floor 1 818 m2 First Floor 2 721 m2 Second Floor 3 Area for each floor   Functions of student affairs Foyer control room Male WC changing rooms sports activities front desk Female WC service room reception first floor Fitness Squash Trans. /Elc. Room Bowling Cafeteria interactive entertainment billiard & ping-pong Kitchen Functions of student affairs Chapter two: General introduction. Project Management Definition Functions Planning phase Quantity surveing Time Secdule Cost Estimate Project Delivery System. Contract Unit Price  Lump Sum :-1- Definition. 2- Musleh Company. 3- Document. BOQ Documents Visiting Site. WBS Chapter three: Methodology WBS SPORT HALL AND STUDENT AFFAIRS SPORT HALL Student Affairs External Work finishing Skeleton finishing Skeleton Ground Floor First Floor Second Floor Ground floor First Floor Second Floor Basement Ground Floor First Floor Second Floor Basement Ground Floor First Floor Second Floor Quantity Surveying Definition:- the estimated quantities of materials required on a project are normally determined by professional surveyor or engineer. Data Required. Importance. Our Quantity Surviving :- Our Quantity. Waste factor. Problems During calculation Sample Calculation. Shear Wall Footing Section in sport hall in ground floor. Finishing Detailing Time Scheduling Definition Importance Time Scheduling steps Activities Logic relation ships Productivity rate Resources Duration Primavera - calendar Activities with durations Bar Chart Cost Estimate Definition Types of cost estimate Pricing Sample calculation Chapter four: Results and Analysis for price Results: Total price of the project 38,809,647.64 Nis. Analysis : The total calculated price is 38,809,647.64Nis while the actual bid price was almost 37 Million, the difference due to: - The actual percentage of profit and taxies maybe less than our assumptions. - Discount’s that the contractor company maybe gets from suppliers. The way they price the items. The price per m2 of the project equals 2573.7 Nis Chapter four: Results and Analysis for time Results: After entering the duration of each activity to the Primavera and re-scheduling the project, the duration of the project is 603 days (work days) and 719 days (calendar days). THANK YOU image1.jpeg image2.jpeg image3.jpeg image4.png image5.png image6.jpeg image7.png image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.jpeg /docProps/thumbnail.jpeg