"Mechanical Systems For the palestinian ECONOMIC POLICY RESEARCH INSTITUTE"  Supervisor : Eng. Ramez Al Khaldi Prepared by : Bahaa Yousef Malhis Nodar Hisham Sabbah Ameer Ghazi Malhis Ala’a Abd An-Naser Diab Presentation out line: - Building Description. - Heating load calculation. - Cooling load calculation. - Duct Design. - Plumbing System. - Fire Fighting System. - Equipment Selection. Building Description Building Location : Country: Palestine. City: Ramallah Elevation: 840 m above sea level Latitude: 32˚. Building face sits at the south orientation. The wind speed in Ramallah is above 5 m/s. Building Details : The Palestinian Economic Policy research institute consists of 6 floors, 5 up ground, one below ground. Overall Heat Transfer Coefficient, U overall The U overall is given by: In our project the method was used as following: Where: U: The overall heat transfer coefficient [W/ m².˚C]. Ri: Inside film temperature [m².˚C/W]. Ro: Outside film temperature [m².˚C/W]. K1, 2, …, n : Thermal conductivity of the material [W/m.˚C]. X1, 2, …, n : Thickness of each element of the wall construction [m]. Results of overall heat transfer coefficient for each element Type Overall Heat Transfer Coefficient U(W/m2.K) Outside wall 0.74 Inside wall 2.6 Ceiling 0.88 Floor 0.88 Glass 3.5 Wood door 3.5 Heat Load Calculations Heat loss by conduction and convection heat transfer through any surface is given by: Where: Q = heat transfer through walls, roof, glass, etc. A = surface area. U = overall heat transfer coefficient. ΔT = Difference in outside temperature and inside temperature. Select inside & outside design condition (from Palestinian code) : Parameters Winter Parameters Winter Tin 22 Win 8.3 Tout 4.7 Wout 4.1 Φin 50% Tun 30.65 Φout 62% General Procedures for Calculating Total Heat Load: Select inside design condition (Temperature, relative humidity). Select outside design condition (Temperature, relative humidity). Select unconditioned temperature (Tun). Find over all heat transfer coefficient Uo for wall, ceiling, floor, door, windows, below grade. Find area of wall, ceiling, floor, door, windows, below grade. Find Qs conduction. Find Vinf, V vent. Find Qs, QL vent, inf. Find Q total and Q boiler. Equations and Results for heating load calculations : Heating load summary : Floor Q Total(KW) Ground Floor 83.8 First Floor 48.1 Second Floor 13.385 Third Floor 32.74 Roof 15.942 Cooling Load Calculations : Select inside & outside design condition (from Palestinian code) : Parameters summer Parameters summer Tin 22 Win 9.6 Tout 30 Wout 16.1 Φin 50% Tun 27.3 Φout 57% In calculations of cooling load, orientation is an important basic factor during calculation, the general equation in cooling calculations is: For transmitted through glass: For convection through glass: Cooling Load Results: Floor Qtotal(KW) Qtotal(TON) Ground floor 89.3 25.5 First floor 47.7 13.6 Second floor 45.9 13.1 Third floor 47.4 13.5 Roof floor 35.9 10.25 Duct Design : Design procedures Number of grills and diffusers are calculated and distributed uniformly. The total sensible heat of floor is calculated. The Vcirculation of floor is calculated. The main branch duct velocity is 5 m/s. The pressure drop (∆P/L) method is achieved for duct design (by using ∆P/L(0.6 Pa/m)). The main diameter is calculated ,at the same (∆P/L). The height and width of the rectangular ducts are determined from software program . Equations For Design duct : The equal pressure drop method for sizing in second floor room (12,13,14) : FCU (No.) section Vcirc (l/s) Velocity(m/s) ∆P/L (Pa/m) H (cm) W (cm) 4 AB 424.95 5 0.6 30 37.5 BC 271.25 3.6 0.6 30 25 CD 174 3.6 0.6 30 200 Plumbing System: Potable water: Find number of unit for fixtures from tables , the results as shown in table: Floor Hot F.U Cold F.U Hot size(in) Cold size(in) Basment 3.75 6.75 1 1.25 Ground floor 10 40 1.25 1.5 First floor 7.5 22.5 1.25 1.5 Second floor 7.5 22.5 1.25 1.5 Third Floor 7.5 22.5 1.25 1.5 Roof 12.75 23.75 1.25 1.5 Sum 49 138 2 2.5 Potable water piping inside floor For example 2nd floor: Riser: cold water: Size(in)A Demand (l/s) Fixture Section 2.5 3.24 138 a-b 2.5 2.91 114.25 b-c 2 2.57 91.75 c-d 2 2.148 69.25 d-e 1.5 1.45 46.75 e-f 1.25 1.052 6.75 f-6 Hot water: Size(in) Demand(l/s) Fixture Section 2 1.81 49 a-b 2 1.78 45.25 b-c 1.5 1.58 35.25 c-d 1.5 1.4 27.75 d-e 1.5 1.25 20.25 e-f 1.25 1.034 12.75 f-6 Drainage System: Two separated stacks one for soil and the other for waste. Each stack 4 in. (standard 4 in for WC,2 in for other fixtuers,4 in floor drain). Fire Fighting System We used in fire system class 3 as standpipe system (cabinet and landing valves). Class III Systems: A Class III standpipe system shall provide 11⁄2 in. (40 mm) hose stations to supply water for use by trained personnel and 21⁄2 in. (65 mm) hose connections to supply a larger volume of water for use by fire departments and those trained in handling heavy fire streams. One riser so 500 GPM for 40 min operating the tank size = 80m^3. Pressure for cabinet = 65 Psi and 100 Psi for landing valve. Equepments Selction Boiler: The heating load for building is 193.9 Kw, and load for boiler selected =1.1*193.9=213.3 Kw, since we have one boiler, Because that we choose from mansour catalog of steam boiler is MS-10 which has a capacity is 470 KW. Chiller: For the building the total cooling load is equal 272.23kw, so the minimum capacity for the chiller should be equal to: 272.23x1.1=300 kw, we select chiller that fits the needs, in tons units=85.7 tons Flow rate= 85.7*2.4=210.48 GPM and 50 HZ. From the figure below we select the chiller of model W P S a 135-2D Fan coil units: Sample 2nd floor: Fan04 1000 Cfm DC P 10 H/C 3 Circulation pumps for chiller S series S55 with 258.688 Pa/m and 6.5 L/s flow rate Hot water pump demand = 28.5 GPM pressure= 6Psi Potable water pumps: From last chapter(plumping) we calculate the total demand cold water of the building which is equal=51.17 GPM pressure=6.7 Psi     Fire water pumps: According to number of risers which equal 1 Now: Flow rate=500 GPM Pressure= 128.4 PSI Jocky pump = 128.4+10=138 .4 Psi image2.png image3.png image4.png image5.png image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.jpeg image17.png image18.jpeg image19.png image20.png /docProps/thumbnail.jpeg