An-Najah National University Faculty of Engineering Building Engineering Department Graduation Project 2 Villa Prepared By : Abdalla Naem Dwikat Project supervisor: DR.Monther Dwikat Outline: Project Definition Architectural Design Environmental Design. Structural Design Electrical Design Mechanical Design Safety Design Site of the project: Location and Site: my project located in sarra, sarra Located to the southwest of the city of Nablus Architectural Design Site Plan : Ground Floor (Area = 200 square meter) First Floor (Area = 200 square meter) North Elevation: South Elevation: East Elevation: West Elevation: Sections 1 : Sections 2 : Environmental design Thermal Comfort Heating and cooling load water efficiency Natural Lighting Shading Acoustics Comfort Thermal Comfort : external wall layer's Total Heating and Cooling Load we use split unit for heating and cooling water efficiency: we separate the gray and black water Natural Lighting day light factor in the fig we can see the daylight factor in a gust bed room in the ground floor and we can see that the average value is 4.29% and that is good daylight factor and the distribution of the daylight is very good. Shading Shutters Design with 25 cm Acoustics Comfort Acoustics design for bed room a average = 0.19996 RT60= 0.80013 , it is accepted . Area Area* Wall 42 0.3 12.6 Ceiling 27 0.04 1.08 Floor 21 0.03 0.64 Door 2.25 0.05 0.1125 Window 4.75 0.04 0.19 wood 1.9 0.07 0.133 curtains 12.4 0.58 7.192 Bed 3.22 0.30 0.93 Total 114.52 22.9 STC Value: external wall 52db internal wall 47db Structural Design Model (concrete frame ) 2 floor , All floor one way ribbed slab Compatibility , equilibrium Internal forces : ok (concrete frame ) : slab design 25 cm one way ribbed slab L.L = 3 KN/ m^2 Super D.L = 4KN / m^2 (concrete frame ) : beams, columns design beam b * h b1 700*500 b2 600*300 b3 500*500 b4 400*500 Column b *h C1 600*300 C2 500*300 C3 400*300 (concrete frame ) : beam details (concrete frame ) : Footing Layout Bearing capacity of soil = 300 KN/ m^2 (concrete frame ) :Footing Details (concrete frame ) :shear wall Details Electrical Design Lighting design (artificial lighting ) : Luminaries Data we used fluorescent lamps because of its ability to save power and they have long life cycle . Lighting design (artificial lighting ) :Lighting Distribution to the ground floor Lighting design (artificial lighting ) :socket Distribution to the ground floor Lighting design (artificial lighting ) : switch Distribution to the ground floor Power design : Circuit Breaker Plans Total load = 4 kw Total current = 5.93Am Total load = 3.1kw Total current = 5.48 Am Mechanical Design Water Supply System Drainage system AC System Fire Place System Fire System Elevators System Roof water Supply System: Water supply system: Draneg System: Manhole system: AC System: Fire Place system: Fire System: we use fire extinguisher Elevators System image1.jpeg image2.jpeg image3.jpeg image4.png image5.png image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.jpeg image14.png image15.jpeg image16.png image17.png image18.png image19.png image20.jpeg image21.png image22.gif image23.jpeg image24.png image25.png image26.png image27.png image28.png image29.png image30.png image31.png image32.png image33.png image34.png image35.png image36.png image37.jpeg image38.jpeg image39.png image40.png image41.png image42.png image43.png image44.png image45.png image46.png image47.png image48.png image49.png image50.png image51.jpeg /docProps/thumbnail.jpeg