Supervision: Dr . Khaled Al-Sahili By: Qusai Naeem Zeri Mahmoud Khaled Ismail Moad Raed Odeh Mofeed Kamal Ghanme Evaluation and Redesign of Amman Street Introduction Roads and Intersections Project ( Study Area ) ( Amman Street) Nablus Geometry Pavement Traffic Study Area Study Area Study Area Study Area Study Area Problem Definition Congestion on Amman Street Problem Definition Defects of Pavement Problem Definition Geometry Problems Vehicles Counting Al-Amidest to Al Ghawi Al-Ghawi to the End PH 7:15 to 8:15 AM 1:30 to 2:30 PM PHV 2026 1393 Data Collection for Amman Street (veh/hr) Data Collection Pavement Inventory No. Midblock Rutting Pothole Drop Shoulder Bleeding Raveling Alligator Block Transvers longitudinal Patching 1        2          3      4      5         6       Surface Defects in Each Midblock Summary of Accident Data Analysis PH, PHV & PHF for Intersections No. Intersection Intersection PH PHV PHF 1 Othman Mosque 7:15 - 8:15 2368 0.89 2 Al- Maturate 7:15 - 8:15 2433 0.91 3 Al-Mai 7:15 - 8:15 2092 0.89 4 Al- Ghawi 1:30 - 2:30 2258 0.90 5 A-Shakhshir 3:15 - 4:15 1546 0.89 6 Golden City 7:15 - 8:15 974 0.89 7 Rujeeb 7:15 - 8:15 1023 0.88 Data Analysis NO. Intersection Name LOS (based on Delay) ICU (%) LOS 1 Othman Mosque _ 96.6 F 2 Al- Matorat C 146.5 H 3 Al-Mai F 132.1 H 4 Al- Ghawi _ 96.8 F 5 A-Shakhshir F 71.6 C 6 Golden City _ 62.8 B 7 Rujeeb C 49.2 A LOS from Synchro Data Analysis Intersections Summary Othman mosque Met (warrant 2 satisfied ) AL-Matorat Met (warrant 2 satisfied ) AL-Mai Not met AL-Ghawi Met (warrant 2 satisfied ) Al-Shakhshir Not met Golden City Not met Rujeeb Not met Warrants of Traffic Signals Pavement Analysis and Design Design ESAL = 1.6 – 1.8 millions Layer Thickness (cm) Asphalt 7 Base course 20 Subbase 20 Data Analysis LOS for Link LOS PTSfd 93.45 % E (closed for F) ATSd( mil/hr) 22.98 Solution and Design Traffic Geometry Pavement Design Othman Mosque Intersection Design Golden City Intersection Design Rujeeb Intersection Conclusions and Recommendations Amman Street and its intersections were evaluated based on traffic, geometric, and pavement conditions. The street has several defects Pavement design was provided. Intersection improvement included traffic control, geometric, and operational improvements. The new design consists of Two lane highway. Cross section includes, shoulder or sidewalk, median at some sections, parking lanes, The approximate cost estimate is $1.15 millions image1.jpeg image2.png image3.png image4.png image5.png image6.png image7.jpeg image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.jpeg /docProps/thumbnail.jpeg