Supervisor : Dr . Abd Alfttah Almallah Water Works For Baqa Al-Sharqyah Town -Analysis And Re/Design An – Najah National University Prepared by : Boraq Ali Raghad Onnab Outline : Objectives Study area WDN Review WWCN Results Conclusion & Recommendations Objectives: Analysis the existing water distribution network. Redesign the existing water distribution network. Design a wastewater collection network. Study area: Location: Located in the north of Tulkarem governorate at a distance of about 17km at the north of the west bank. 2. Surrounded by Apartheid wall from the west, Wadi Abu Nar from the south and some villages that surrounds the rest of it. Location: Study area: Topography: The elevation of Baqa ranges from 60 up to 130 meters above sea level. This town varies in its terrains, it has three mountains at the east, plain from the west and valley from the south. Study area: Population Calculations Year 2007 2008 2009 2010 2011 2012 2013 2014 2015 Pop. 4064 4143 4222 4304 4386 4471 4555 4641 4726 population estimations from the Palestinian Central of Statistics: The study period is 30 years from now (2015) so depending on these data and using annual compounding method We predict the population in 2045, P(2045) = 9674 capita. Design demand = 4704.6 m³/day. Design load = 4015 m³/day. Graduation Project 1 Review Water Distribution Network Methodology: Drawing the existing network Distribution of houses for each junction in each service area Redesigning and changing the main pipe size Results: Pressure Velocities Pressure: Velocities: Recommendations: Pressure reducing valves (PRV) for high pressure. Internal pumps for low pressure. Boosters for low velocities. WasteWater Collection Network Methodology: Drawing the Network Arc-hydro: Long time Low accuracy Shorter time Medium accuracy Very short time High accuracy Arc-Hydro Method Results: Cover Slope Velocity Length of conduits Cost Cover Depth: Slope: Velocity: Length of conduits: Cost Estimations: Considering the prices in our country, we estimated the total cost of the wastewater collection network = 1563206$, and the cost per 1km = 72683$. Conclusion and Recommendations: Flushing system in the network especially where low velocities occurs. Implementation of Continuous maintenance to the network. Constructing a waste water treatment plant to avoid pollution of the environment and to reuse the treated water for agriculture instead of wasting it. Thank you image1.png image2.png image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.png image15.png image16.png image17.png /docProps/thumbnail.jpeg